2. Engineers are designing a bridge across a river. Some of the constraints that the engineers will consider are the time it takes to build the bridge, the cost of the construction of the bridge, and how much traffic will cross the bridge. Which of the following is also a VERY IMPORTANT constraint that the engineers would need to consider?